Johnson&Johnson

Johnson & Johnson

<span class ="tr_" id="tr_4" data-source="" data-srclang="en" data-orig="Johnson">Johnson</span> & <span class ="tr_" id="tr_5" data-source="" data-srclang="en" data-orig="Johnson Project Case">Johnson Project Case</span>: Palas 210 <span class ="tr_" id="tr_6" data-source="" data-srclang="en" data-orig="Dual-Lane Capping System">Dual-Lane Capping System</span> | <span class ="tr_" id="tr_7" data-source="" data-srclang="en" data-orig="innopkg">innopkg</span>
CONTRACT NO. PO20190604

Johnson & Johnson Project:
Palas 210 Dual-Lane Capping

A high-capacity consumer health production solution featuring Siemens-driven servo control and automated vision-based rejection system for J&J personal care bottles.

Line Efficiency

40 – 60 BPM

Architecture

Dual-Lane Automatic

Cap Range

Φ30 – Φ70mm

Control Core

Siemens S7 Series

Engineered for J&J Global Standards

Dual-Lane Synchronous Flow

Optimized for high-throughput requirements (up to 60 BPM), las palas 210 processes two bottles simultaneously in a compact footprint, maximizing workshop efficiency.

Automated Defect Rejection

Equipped with intelligent sensors to detect cap placement. Improperly capped products are automatically rejected via a pneumatic tipping mechanism without stopping the line.

Siemens Servo Integration

Full Siemens ecosystem (SOCIEDAD ANÓNIMA, HMI, Servo Motors) ensures precise torque application, preventing cap damage and ensuring 100% seal integrity for healthcare products.

Real-time System Logic Simulation

World-Class Component Ecosystem

Las Palas 210 is built with premium components to meet stringent GMP & ISO requirements.

Control & Drive
SIEMENS
S7 PLC, HMI, and Servo Drives (Germany)
Sensing Systems
SICK
Photoelectric & Ultrasonic Sensors (Germany)
Pneumatic Logic
FESTO
Solenoid Valves and High-Speed Cylinders (Germany)
Motion Control
DANFOSS
VLT Series Frequency Inverters (Denmark)
Power Safety
ABB / SCHNEIDER
Circuit Breakers & Contactors (Switzerland/France)
Mechanical Precision
NSK / SIKO
Precision Bearings & Digital Displays (Japan/Germany)

Technical Support & Documentación

As per Contract PO20190604, Innopkg provided a comprehensive validation package tailored for the J&J Shanghai Facility.

  • ✅ 10-Day Documentation Delivery (Manuals/Schematics)
  • ✅ On-site SAT & FAT Testing
  • ✅ Multi-Product Rapid Switchover Training
  • ✅ 24-Month Warranty Support
QUALITY
ASSURED

Modernize Your High-Speed Capping Line

Trust the partner that powers global leaders in healthcare and beauty.

Consult Our Engineering Team

Deja un comentario

Su dirección de correo electrónico no será publicada. Los campos obligatorios están marcados *