Linha de Produção

INNOPKG · Turnkey Line Solutions

Complete Production Lines — Filling, Limite & Labeling Turnkey Systems

Complete turnkey filling-capping-labeling lines for cosmetics and daily chemicals. From URS to FAT in 60 working days. 81 projects delivered across 4 regions.

Typical Production Process

📦

Bottle Unscrambling

U48 / U100

→
⚙️

Filling

ATLAS / HIDRA

→
📦

Conveying

GC 100

→
đź”§

Limite

PALAS / MAIA

→
🏷️

Labeling

External

Ready-Made Solutions

Choose from proven configurations or customize your own line.

🏭 Complete Filling Line

Standard configuration for mid-scale production.

📊 80-120 BPM
👥 2-3 Operators
U48 UnscramblerATLAS 220 FillingGC 100 GripperPALAS 210 Limite
⚡ HYDRA + PALLAS Combo

High-speed line for larger daily output.

📊 100-150 BPM
👥 1-2 Operators
U100 UnscramblerHIDRA 210 FillingGC 210 GripperPALAS 310 Limite
🎯 Custom Solution

Tailored engineering from needs analysis to installation.

📊 Custom BPM
👥 Flexible
Needs AnalysisLine DesignConfigurationInstallation

Solution Comparison

Compare speed, labor and flexibility across common line configurations.

EspecificaçãoBasic LineHYDRA+PALLAS ComboCustom Line
Capacity80-120 BPM100-150 BPMCustomizable
Operators Required2-3 people1-2 peopleBased on design
Floor Space15m Ă— 3mMore compactCustom
Tempo de mudançaWithin 30 minWithin 25 minOptimized
Suitable ForCosmetics, Daily ChemicalLarge-scale High-speedAny Industry

Customer Success Stories

Real outcomes from INNOPKG turnkey line projects.

+40%

Cosmetics Manufacturer, France

ATLAS 220 + PALAS 210 increased line speed from 60 para 100 BPM and reduced changeover from 1 hour to 20 minutos.

500K+

Pharma Company, Brazil

HIDRA 210 + PALAS 310 line achieved 500K+ bottles/day with stable 16-hour operation and low downtime.

2 yrs

Daily Chemical Brand, Indonesia

Custom solution doubled capacity and reduced labor cost significantly, reaching ROI in two years.

Frequently Asked Questions

Common questions about complete production line solutions.

What does a complete line include?

Typical scope includes bottle unscrambler, filling machine, conveyor, capping machine and labeling integration with unified controls.

How long does installation take?

Standard lines usually need 7–14 days for installation and commissioning; custom lines may require 2–4 weeks.

What’s the warranty and support?

12-month warranty, on-site commissioning and training, plus 24/7 remote technical support and fast spare-parts service.

Can I upgrade my existing line?

Yes. We can integrate new INNOPKG equipment with compatible existing machinery and control architecture.

Do you provide financing options?

Flexible commercial terms can be discussed based on project scale, region and delivery milestones.

What industries do you serve?

Cosmetics, produtos farmacĂŞuticos, daily chemicals and selected food-liquid applications.